A12 closed southbound (obstruction)
Road closure on the A12 southbound at Blackwall Tunnel Northern Approach on Monday 9 November 2026, from 00:18. Cleared at 04:00 after 3 h 42 min. Timeline of reports from TfL.
- Status
- Cleared 04:00 on 9 Nov 2026, after 3 h 42 min
- Location
- A12 southbound · Blackwall Tunnel Northern Approach
- Reported as
- Obstruction or hazard
- At its worst
- Road closed
- Sources
- TfL
Timeline
- TfL: obstruction or hazard, road closed
- TfL: “The road has reopened, but residual traffic is still quite heavy.”
- TfL: road reopened, “A102 has now reopened, the on slip to the A102 (tunnel entrance) remains closed. The road has reopened, but residual traffic is still quite heavy. The on slip is still closed.”
- TfL: “from the A13 westbound is still closed.”
- TfL: “the A102 southbound traffic is flowing well. The on slip from the A13 westbound is still closed.”
- TfL no longer reports it
- All clear: no source reports it any more
Source reports
- [A12] Blackwall Tunnel Northern Approach (Southbound) between [A13] East India Dock Road and [A102] Blackwall Tunnel - The A102 has now reopened, the on slip to the A102 (tunnel entrance) remains closed. The road has reopened, the A102 southbound traffic is flowing well. The on slip from the A13 westbound is still closed.
Other recent incidents on the A12
- A12 crash
- A12 stopped traffic
- A12 closed
- A12 closed
- A12 stopped traffic
- A12 stopped traffic
- A12 closed Eastern Avenue West westbound
- A12 crash A12 northbound
- A12 crash southbound
- A12 crash A12 westbound
The sources don't report causes or injuries, so neither does this page. Times are UK time. For alerts, follow @motorways.me on Bluesky.